HIGH EFFICIENCY
LARGE DIAMETER EXCAVATOR SERVICES:
2500
TON PRESS AND PROCESSING TRACKS MAXIMIZE EFFICIENCIES
• Wire Rope Industries maintains a
fully dedicated 2500 ton hydraulic press and two full-time
process tracks for large diameter mine excavator ropes. This
ensures maximum efficiency and quality of assembly.
REDUCE COSTS AND IMPROVED
EFFICIENCY WITH SWAGED FERRULE BECKETS
• Compared to traditional pouring methods,
swaged drum end ferrule beckets, for ropes up to 2 3/4" (70
mm) in diameter, save costs by significantly reducing the
time needed to process terminals. This process also provides
maximum terminal efficiency and consistency.
PAD EYE BECKET LOOP
CONVENIENCE
• Pad eye becket loop service, for
standard drum terminations, allows for the quick and simple
installation of ropes and the reduction of machine down-time.
ACCURATE LENGTH MEASUREMENTS
• Length measurements, using calibrated
track systems, ensure that pairs of excavator ropes are within
customer specified length tolerances.
HAIRPIN WOUND REELS
SIMPLIFY INSTALLATION
• To further reduce machine down-time,
hairpin winding of ropes can be considered. This process allows
installation crews to install both drum ends of a rope at